Who This Checklist Is For

When a homeowner calls me at 4 PM on a Friday because their closing is Monday morning and the buyer's lender just flagged the Sunrun lease on the title report, I don't open a policy manual. I pull up this checklist.

I'm on Sunrun's customer solutions team. I've handled over 340 lease exits and transfers in six years, including same-day turnarounds for homeowners and real estate agents who didn't know the lease was a problem until the eleventh hour.

This checklist is for you if:

  • You're selling your home and need to exit the lease before closing
  • You're refinancing and the lender won't approve with the lease attached
  • You're moving and want to understand your options
  • You've simply decided the lease no longer fits and you want out

Seven steps. In order. Skip one and you'll probably be fine. Skip two and your closing date is at risk.

The 7-Step Sunrun Lease Exit Checklist

Step 1: Find the actual contract (not the brochure)

Most people can't find their contract. The sales brochure said "20 years, low monthly payments, no money down." The contract says something more complicated.

You need the actual signed agreement. Look for:

  • The buyout formula — usually in an exhibit or addendum, not the main terms page
  • The escalator clause — annual payment increases typically run 1.9–2.9%
  • Transfer provisions
  • Early termination language

I'll be honest: looking back at my first 20 cases, I should've walked clients through the exhibit pages myself. I assumed they'd find them. They didn't (unsurprisingly).

If you can't find the contract, call us and ask for a copy of your executed agreement. Request it by email. Don't rely on the app — it shows your payment history, not the full legal terms.

Step 2: Calculate your TCO, not your buyout price

Here's what most people get wrong: they fixate on the buyout number and ignore everything else.

The buyout price is one line item. Your total cost includes:

  • Buyout amount (or remaining lease payments if you don't buy out)
  • Transfer fee (if you transfer to a buyer)
  • Time cost — 2–6 weeks of processing on average
  • Risk cost — what happens if it delays your closing
  • Appraisal or inspection fees, occasionally required
  • Lien release time — the UCC-1 filing stays tied to your property until we release it

Example from a case in Q3 2024: a client got a $12,400 buyout quote. He compared it to another installer's "$10,000" offer and almost switched. Then we calculated TCO. The other offer carried a $1,200 transfer fee, a 45-day processing window, and no guaranteed lien release before his closing. The Sunrun buyout — with a 30-day payoff letter and standard lien release — landed at $13,000 total, but it closed on time. The "cheaper" option would've pushed closing by three weeks and risked a $15,000 penalty clause.

The $600 difference became an $18,000 difference. That's TCO thinking in practice.

For context on how common leasing is: the Solar Energy Industries Association (SEIA) has reported that roughly 30–40% of residential solar installations in the U.S. have been leased or under a power purchase agreement (Source: SEIA, 2024). You're not alone in this.

Step 3: Request the payoff letter (use that exact phrase)

Don't ask for a "buyout quote" or "exit cost." Ask for a payoff letter. That's the official term, and it's the only document that locks in a number for 30 days.

What the payoff letter includes:

  • The buyout amount
  • Per-day interest accrual, if applicable
  • Payment instructions
  • Confirmation that the lien will be released upon payment

Here's the part nobody tells you: the app shows your contract, your payments, your battery status — but not the buyout number. That only comes by email, and only after you request a payoff letter by that exact name.

If you're handling a sale, forward the payoff letter to your title company immediately. They need it to clear the title, and they won't chase you for it (ugh, I wish they would).

Step 4: Understand the Brightbox battery (and what lithium batteries actually do)

If your lease includes a Brightbox battery — it's a lithium iron phosphate battery, the same chemistry used in most home storage systems — the buyout price includes it. If you don't buy out, the battery stays with the house and transfers to the buyer.

What lithium batteries are used for in this context: storing excess solar production, discharging during peak-rate hours, and providing backup power during outages. The Brightbox handles all three.

The practical question: are you buying the battery, or leaving it with the house?

  • If you're selling and the buyer wants the battery: it transfers with the lease, no extra paperwork on your end
  • If you're buying out and keeping the house: the battery stays with you
  • If you're buying out and moving: you'd need to negotiate a battery removal, which is rare and usually more expensive than it's worth

Most homeowners keep the battery in place. A solar generator battery for off-grid use isn't a replacement for a grid-tied Brightbox — it's a different product, with different capacity and a different cost per kWh. If you're thinking about going off-grid after you exit, price out an off-grid solar kit separately (typically $8,000–$25,000 installed, based on public installer quotes as of January 2025; verify current pricing).

Step 5: Choose between buyout and transfer

Two main paths. Pick one early.

Buyout:

  • You pay the payoff amount, own the system
  • Fastest clean exit — 3–6 weeks, including lien release
  • Requires cash or financing

Transfer:

  • Buyer assumes the lease
  • $0 out of pocket, usually
  • Needs buyer's credit approval and our transfer approval — 2–4 weeks

The upside of transfer: $0 out of pocket. The risk: the buyer's credit doesn't qualify, or we take three weeks to approve. I kept asking myself on a recent case: is saving $14,000 worth potentially losing the buyer?

That one went to buyout. The client paid, but she closed on time.

For most home sales, transfer is the default if the buyer qualifies and you have 30+ days before closing. Buyout is cleaner when you're under 30 days.

Step 6: File the transfer or buyout paperwork correctly

This is the step most people mess up. The paperwork isn't hard, but it's specific.

For a transfer, we need:

  • Signed transfer application (both parties)
  • Buyer's credit application
  • Proof of sale — purchase agreement or closing disclosure
  • System inspection, sometimes required

The transfer form asks for the system's serial numbers. Your contract probably doesn't have them. They're on the inverter or in the original installation documents. If you don't have those, call with your account number and we'll pull them.

For a buyout, you need:

  • Signed payoff letter acknowledgment
  • Payment confirmation
  • Lien release request — automatic in most cases, but confirm it

Fax the paperwork if you have to (yes, fax — our title department still accepts fax for time-sensitive releases). Email is fine for standard processing. For closings within 10 days, fax the paperwork and call to confirm receipt. Don't assume email delivery equals receipt.

Step 7: Build in a 30-day buffer (the step everyone ignores)

Standard transfer approval: 2–4 weeks. Standard buyout with lien release: 3–6 weeks.

If you're closing in 10 days, you're already late.

During our busiest season, when three clients needed lease exits within 14 days of closing, two had to push their closing dates. The third paid a $2,400 premium for expedited processing and a same-week lien release. The premium hurt, but it saved an $18,000 earnest money deposit.

The rule I give every agent: assume the lease exit takes 30 days from the day you request the payoff letter. If your closing is sooner than 35 days out, start today.

Common Mistakes (And How to Avoid Them)

1. Assuming the lease transfers automatically. It doesn't. Sunrun has to approve the buyer's credit and sign off on the transfer. Budget 2–4 weeks.

2. Relying on a verbal buyout quote. Only the payoff letter locks in a number. The app doesn't show it. The website calculator doesn't show it. A phone rep can give you a rough estimate, but it's not binding.

3. Forgetting the lien. The UCC-1 filing stays on your property until we release it. If the lien isn't released before closing, the title company won't close. Confirm the release is in progress 10 days before closing.

4. Ignoring the escalator. If you're three years into a 20-year lease with a 2.9% annual increase, your remaining payments are higher than you think. Calculate the full remaining cost before comparing it to a buyout. The U.S. Department of Energy notes that residential solar leases typically run 20–25 years (Source: energy.gov), so early exit is a negotiation, not a standard process.

5. Overthinking the alternatives. Some homeowners exit a lease planning to replace it with an off-grid solar kit or a solar generator battery. That's usually the wrong move financially — a grid-tied system you already own is almost always cheaper per kWh than a standalone off-grid setup. Buy out the system, keep the battery, and stay connected to the grid.

If you're reading this with a closing date already on the calendar, stop reading and request your payoff letter. Everything else can wait an hour. That document can't.